Academic
Delaware State University
This 2-story and courtyard addition is being used to store plant samples in a humidity controlled environment and provide an academic area for students. The addition is accented by an open view from the first floor to the skylight and a walkway overlooking the study area below.
University of Delaware Morris Library
This was a two-phase project. The 1st phase consisted of demolition of two office areas, followed by a fit-out to give the administrative personnel a place to work while we did the major renovations in the 2nd phase. The library remained open during this construction process to both the students and the public. Great care was taken to ensure a safe, quiet and clean work environment. This phase of the project, which included floor penetrations, was located on the second floor directly above their rare book collection. This project was completed without a "hitch" and earned high praises from the entire construction team.
University of Delaware Otis Smith Lab
This building addition at the Lewes campus of the University of Delaware contained labs and office space for the Marine Studies program. The labs were supplied with hot, warm & cold salt water for use in their research. As a result, the steel of the structure was galvanized and the floors were seamless epoxy.